Design to your lighting budget,
not backwards from it.

The energy code tells you how to count watts before it tells you your budget. This advisor flips that: it surfaces your power allowance first, then shows the controls each space type will expect — so you can shape a compliant design while the program is still fluid. It informs decisions; it doesn't certify them.

About this tool. LPD values are encoded from base 2018 IECC — Building Area Method from Table C405.3.2(1) and Space-by-Space from Table C405.3.2(2), read directly from the IECC Code & Commentary. Context-specific space rows are flattened to named entries; Atrium uses a height-based formula (0.03 W/ft² per ft of height, or 0.40 + 0.02 per ft above 40 ft) and is entered manually. This advisor is informational, assumes new construction, and doesn't model the IECC applicability gate or constitute a code review — always verify against your jurisdiction's adopted edition and confirm interpretations with the AHJ before permit.
00 / PHASE

Where are you in the design?

Your design phase sets which allowance method fits. BAM needs only a building type and total area — right for early design. SBSM needs the space program, gives a higher allowance, and unlocks tradeoffs and additional allowances — right once the program firms up.