HELIOS · IECC 2018 · Section C405 · Idaho-adopted · New construction
Commercial Lighting Compliance Workflow
HELIOS — High-Efficiency Lighting & IECC Optimization System. A guided sequence of design-phase tools — from establishing the lighting power allowance through daylight zones, the fenestration envelope, and the final interior and exterior compliance checks. Work through them in order.
| 1 |
IECC 2018 · Section C405 · New construction Establish the interior lighting power allowance from code at the earliest stage — before contracting with manufacturers. Sets the budget envelope to design against. |
Launch → |
| 2 |
C405.2.3 · Sidelit + Toplit Zones Compute the sidelit (C405.2.3.2) and toplit (C405.2.3.3) daylight zone areas — adjacent to vertical fenestration and beneath skylights and roof monitors — to identify the spaces requiring daylight-responsive controls. |
Launch → |
| 3 |
C402.4 · Fenestration (Prescriptive) C402.4 Fenestration Compliance Verify fenestration area and SHGC against the prescriptive envelope requirements before finalizing the lighting compliance path. |
Launch → |
| 4 |
IECC 2018 · Section C405.3 + C405.2 The final check — interior lighting power allowance and required lighting controls under C405.3 and C405.2, confirming the design lands within code. |
Launch → |
| 5 |
IECC 2018 · Section C405.4 Check exterior lighting power allowances and required controls under C405.4 — façades, entrances, parking, and grounds — against the code limits to close out the design. |
Launch → |